Control & Stationing
Articles focused on aligning the digital file to the physical jobsite. (e.g. Recording control points, Understanding delta and error values, Station setup and verification, Re-stationing mid-print, Common control point mistakes)
- Radio 1 vs. Radio 2: Capabilities and Feature Support
- Why You Shouldn't Move the Reflector to Lower Distance or Station Errors
- How to Set Up and Use the Verification Reflector
- What Is Flexible Control? Stationing Tools for Imperfect Jobsites
- Understanding Station Information: Reading Distance Errors and Station Errors to Remove Bad Control Points
- How to Use the Control Point Target to Place the Reflector on a Control Point
- What Is Flexible Control? Stationing Tools for Imperfect Jobsites
- Control Point Creation Requirements for Surveyors (Placement, Count, and CSV Format)
- How to Use the Verification Reflector to Detect Laser Tracker Movement
- How to Select Control Points for Better Stationing Accuracy
- "Tracker May Be Tilted" or "Elevations Do Not Match File Data" Error
- RB1 Radio Screen Must Be Set to Radio Mode Before Stationing
- How to Use Vertical Control Points
- How to Create Manual Control Points from Printed Intersecting Lines
- Troubleshooting Control Points for a Reliable Control Network
- What Are Control Points and Why Dusty Needs Them
- Troubleshooting High Error Values During Stationing