The kit is a heavy duty temporary floor protection board, a knife, tape, and a fine marker. The trainee rolls it out, tapes it down, and measures and marks the four control points at least a day before the session.
|
Roll the floor protection board out on a flat, hard surface Tape every seam and edge so nothing lifts or shifts. The floor protection board should cover a space of at least 8’ 6“ × 8’ 6“. Use the knife provided in the training kit to get to the desired dimensions. |
|
|
Mark the control points Mark the corners of a 8’ × 8’ square. Mark each point clearly enough as a 4” x 4” cross using the provided marker in the training kit. |
|
|
Label the control points Label the points CP01, CP02, CP03, and CP04. |